§ 20-313. Electrical distribution and underground electric distribution substations.  


Latest version.
  • Electrical distribution and underground electric distribution substations are subject to the following conditions:

    (1)

    The distribution and underground electric distribution substations must be served by a collector or major arterial street as designated in the comprehensive plan.

    (2)

    The distribution and underground electric distribution substations will not have sanitary facilities and will not be used for habitation.

    (3)

    The distribution and underground electric distribution substations will be located on at least five acres of property.

    (4)

    A security fence as specified in the National Electric Safety Code shall surround the distribution and underground electric distribution substations.

    (5)

    A landscaping plan shall be submitted for city approval.

    (6)

    Distribution and underground electric distribution substations shall be a minimum of 500 feet from single-family residences.

    (7)

    A summary of current research regarding the health effects of EMF levels, conducted by health and scientific professionals, including those who do and do not receive utility sponsorship.

    (8)

    Provide EMF levels under maximum and average anticipated loading at the base of the utility poles, underneath the wires between the poles, at ground level above underground wires, at the edge of the property line, at the edge of the closest habitable building, and at the point above ground where there would be the greatest EMF level.

    (9)

    Reasonable and prudent measures to minimize EMF levels along all alternative electric line routes.

    (10)

    Depictions of the views of the proposed facility, if above ground, from at least two directions selected by city staff.

    (11)

    The site is guided office/industrial on the City of Chanhassen Land Use Plan.

(Ord. No. 390, § 3, 3-14-05)