§ 20-1564. Structure setbacks.


Latest version.
  • (a)

    All structures shall be set back a minimum of 40 feet from the primary zone, except as specified below. No disturbances of the site shall occur within the first 20 feet of such setback from the primary zone boundary.

    (b)

    On parcels of land located within the Bluff Creek Overlay District on which a principal structure has been constructed prior to December 14, 1998:

    (1)

    The minimum setback from the primary zone shall be the existing principal structure setback, if less than 40 feet.

    (2)

    If the existing principal building or structure setback is less than 40 feet and greater than or equal to 20 feet, then the first 50 percent of the established primary zone setback shall remain undisturbed.

    (3)

    If the existing principal building or structure setback is less than 20 feet there shall be no grading or alterations beyond the existing setback.

(Ord. No. 286, § 8, 12-14-98; Ord. No. 364, § 2, 1-12-04; Ord. No. 377, § 159, 5-24-04; Ord. No. 394, § 1, 4-25-05)